Artemis

First NASA Artemis mission to Moon launched, powered by Boeing-built core stage

Share

  • Artemis I mission paves way for returning humans to deep space exploration

  • First rocket to launch crew to Moon currently in production

NASA’s Space Launch System rocket, powered by the Boeing-built core stage, lifted off at 01:47 (UTC-5) from the Kennedy Space Center. Eight and a half minutes into the flight, the core stage completed its mission and separated from the upper stage of the rocket, sending NASA’s Orion spacecraft on its first journey around the Moon.

NASA’s Space Launch System rocket with the Orion spacecraft launches from Launch Complex 39B, Wednesday, Nov. 16, 2022, at the Kennedy Space Center in Florida. The uncrewed Artemis I flight test-launched at 1:47 a.m. ET, and will serve as an end-to-end test of the launch system and spacecraft’s capabilities. (Photo credit: John Grant)

 

“Today, this country now has a super-heavy lift launch capability for the first time in 50 years,” said Jim Chilton, senior vice president of Boeing’s Space and Launch division. “This test flight was a demonstration of engineering innovation, and we are ready to support NASA and their international partners in returning humans to deep space exploration.”

During the mission, the core stage demonstrated several important functions, including fueling both tanks, actuating the hydraulic system, igniting the engines, running thrust vector control programs in flight, depleting the fuel tanks, shutting down the engines, and conducting successful separation and disposal manoeuvres.

“It was an absolutely beautiful launch – visually and technically,” said John Shannon, vice president and programme manager of Boeing’s SLS programme. “This rocket controls incredible forces while speeding through the atmosphere. It performed the mission as we designed it to do, and we thank our team and partners for all their hard work in making this first launch a success.”

The core stage of the rocket stands at 212 feet (almost 65 metres) and is comprised of a 196,000-gallon liquid oxygen, a 537,000-gallon liquid hydrogen tank, along with an intertank section joining the two fuel reservoirs, a forward skirt on top that connects to the upper stage, and an engine section with four RS-25 engines combining for 2.2 million pounds of thrust. A Boeing team manufactures the core stage at NASA’s Michoud Assembly Facility in New Orleans, Louisiana, and uses components made by more than 430 suppliers across the United States.

The Boeing team is preparing the next stages for their respective flights. Core Stage-2, or CS-2, will launch the first crew of the Artemis program and is in the final assembly area at Michoud. CS-3 is manifested to launch the first crewed lunar landing since Apollo, which will include the first woman and first person of colour. That stage, as well as CS-4, are already in work at Michoud. Additionally, the structural test article of a newer, more powerful upper stage known as the Exploration Upper Stage is in fabrication.

KENNEDY SPACE CENTER, Fla., Nov. 16, 2022 /PRNewswire/

 

Boeing in Europe added the following comments:

This post was published on 16 November 2022 12:05

André Orban

M. Sc. Engineering

Published by
André Orban

Recent Posts

American Airlines 787 suffers tyre failure after landing at Chicago O’Hare

An American Airlines Boeing 787-8 registered N806AA arriving from Barcelona suffered a tyre failure after…

21 October 2026

Norwegian adds four routes from Oslo, Copenhagen and Billund for 2027

Norwegian will launch four European routes in 2027, connecting Oslo and Copenhagen with Seville, Copenhagen…

21 October 2026

Qatar Airways to launch Western Sydney flights in December 2027

Qatar Airways plans to launch three weekly flights between Doha and Western Sydney International Airport…

21 October 2026

Norwegian adds new routes to Seville, Santiago de Compostela and Manchester

Norwegian will launch several new European routes for summer 2027, including direct flights from Oslo…

21 October 2026

Leipzig airport plot raises wider concerns over security of European aviation

The failed drone attack targeting a Ukrainian Antonov cargo aircraft at Leipzig/Halle Airport has taken…

21 October 2026

Lufthansa Group launches first consumer campaign for umbrella brand

Lufthansa Group launched its first group-level consumer advertising campaign on 21 October, seeking to raise…

21 October 2026