Categories: Boeing

Boeing South Carolina Begins Final Assembly of its First 787-9 Dreamliner

Share

North Charleston site joins Everett, Wash., team in building newest Boeing 787

Boeing has started final assembly of the 787-9 Dreamliner at its South Carolina facility. The team began joining large fuselage sections of the newest 787 Nov. 22 on schedule, a proud milestone for the South Carolina team and another sign of stability for the program.

The North Charleston, S.C., site joins Boeing’s Everett, Wash., final assembly, which began 787-9 production in May 2013. United Airlines will take delivery of the first South Carolina-built 787-9.

“Our team is well prepared and eager to assemble the 787-9 Dreamliner,” said Jack Jones, vice president and general manager of Boeing South Carolina. “Achieving this significant milestone in our final assembly operations demonstrates that we’re performing well here at Boeing South Carolina. We’re looking forward to delivering our first South Carolina-built 787-9 to United Airlines, and delivering 787-9s as well as 787-8s to all our customers.”

The 787-9 complements and extends the 787 family, offering airlines the ability to grow routes opened with the 787-8. With the fuselage stretched by 20 feet (6 meters), the 787-9 can fly up to 40 more passengers an additional 450 nautical miles (830 kilometers) with the same exceptional environmental performance – 20 percent less fuel use and 20 percent fewer emissions than the airplanes it replaces. The 787-9 leverages the visionary design of the 787-8, offering passenger-pleasing features such as large, dimmable windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

NORTH CHARLESTON, S.C., Nov. 24, 2014 /PRNewswire/

This post was published on 25 November 2014 13:52

André Orban

M. Sc. Engineering

Published by
André Orban

Recent Posts

Airbus considers second A350 assembly line as long-haul demand grows

Airbus is preparing to decide on an expansion of A350 production capacity as airlines seek…

16 October 2026

Ryanair answers passenger’s windowless-seat complaint: ‘Take a nap’

Ryanair responded to a passenger’s complaint about its windowless seat 11A with a characteristic social-media…

16 October 2026

VINCI launches Lyon Terminal 2 overhaul ahead of 2030 Winter Olympics

VINCI Airports has launched the redevelopment of Terminal 2 at Lyon-Saint Exupéry Airport, with opening…

16 October 2026

Bonza backer Joshua Wander pleads guilty in US$500 million fraud case

Joshua Wander, co-founder and chief executive of 777 Partners, the investment firm that financed failed…

16 October 2026

Condor launches daily Berlin–Abu Dhabi flights with Etihad codeshare

Condor has launched daily flights between Berlin Brandenburg and Abu Dhabi, operated in codeshare with…

16 October 2026

Delta to launch daily Boston–Reykjavík flights in April 2027

Delta Air Lines will introduce daily seasonal flights between Boston and Reykjavík Keflavík on 12…

16 October 2026