Boeing has grounded its 777X test fleet after discovering a severed thrust link on one test aircraft during a routine inspection in Hawaii. Further checks revealed cracks in the assemblies of two other planes. The FAA, which recently approved 777X certification test flights, was promptly notified.
The GE-9X engines, the largest ever built, are central to the 777X design, with Boeing having developed a specific titanium thrust link for added safety. The programme, first announced in 2013, has faced repeated delays, and this latest issue may further push back its timeline.
Emirates President Sir Tim Clark, awaiting 200 of the planes, doubts deliveries will happen before 2026. Analysts warn that this setback could prolong approvals and diminish investor confidence in Boeing’s ability to deliver the 777X on schedule.
This post was published on 20 August 2024 13:28
Embraer has delivered the first E175 equipped with RECARO R2 passenger seats to American Airlines,…
LOT Polish Airlines has joined TSA PreCheck, allowing eligible passengers departing from participating US airports…
Munich Airport will offer 182 destinations in 67 countries during its winter 2026/27 timetable, with…
A Canadair Challenger 604 operated by Triton Aviation made an emergency landing at Abuja’s Nnamdi…
Antwerp Airport could see electric passenger aircraft enter service from 2030, with ASL Group and…
VINCI Airports handled 93.5 million passengers in the third quarter of 2026, down 0.6% year-on-year,…