The groundbreaking ceremony took place on 28 januari for new dismantling hall Aerocircular at the International Airport Ostend-Bruges. “We are very grateful we were able to do this in the presence of Mr. Ben Weyts, minister of transport, Mr. Bart Tommelein, the mayor of the city of Ostend and our partners WVI, LOM and the airport of Ostend-Bruges.” After completion of the first fase (the construction of the concrete carrying surface), Aerocircular will build a steel fabric structural hall of 4500 sqm where two narrow body aircraft can be placed at the same time and dismantled indoors.
This post was published on 28 January 2019 18:41
Lufthansa will end Airbus A340-600 passenger operations on 18 October, with the final scheduled service…
A technical failure affecting Italy’s air traffic control systems disrupted flights at Brussels Airport on…
Red Sea Airlines) charter flight 4S321 from Hurghada, Egypt, to St. Petersburg, Russian Federation, operated…
Airbus is preparing to decide on an expansion of A350 production capacity as airlines seek…
Ryanair responded to a passenger’s complaint about its windowless seat 11A with a characteristic social-media…
VINCI Airports has launched the redevelopment of Terminal 2 at Lyon-Saint Exupéry Airport, with opening…