The groundbreaking ceremony took place on 28 januari for new dismantling hall Aerocircular at the International Airport Ostend-Bruges. “We are very grateful we were able to do this in the presence of Mr. Ben Weyts, minister of transport, Mr. Bart Tommelein, the mayor of the city of Ostend and our partners WVI, LOM and the airport of Ostend-Bruges.” After completion of the first fase (the construction of the concrete carrying surface), Aerocircular will build a steel fabric structural hall of 4500 sqm where two narrow body aircraft can be placed at the same time and dismantled indoors.
This post was published on 28 January 2019 18:41
An American Airlines Boeing 787-8 registered N806AA arriving from Barcelona suffered a tyre failure after…
Norwegian will launch four European routes in 2027, connecting Oslo and Copenhagen with Seville, Copenhagen…
Qatar Airways plans to launch three weekly flights between Doha and Western Sydney International Airport…
Norwegian will launch several new European routes for summer 2027, including direct flights from Oslo…
The failed drone attack targeting a Ukrainian Antonov cargo aircraft at Leipzig/Halle Airport has taken…
Lufthansa Group launched its first group-level consumer advertising campaign on 21 October, seeking to raise…