London City Airport disappointed by Mayor of London direction to refuse planning permission

Share

London City Airport (LCY) is perplexed and disappointed by the Mayor of London’s direction to refuse planning permission for the City Airport Development Programme (CADP) – a scheme which solely comprises the extension of existing infrastructure to enable the airport to achieve an already-permitted growth in flight numbers.

The CADP has the ability to deliver an additional £750m per annum to the UK economy, 2,000 new jobs in Newham and the east of London (500 of these during construction), vital additional air connectivity for the capital, the arrival of ‘Next Generation’ aircraft (which are quieter and have a longer range) and will create a world-class gateway to the burgeoning economic and tech centres that are London’s Royal Docks, the Queen Elizabeth Park and Stratford.

Declan Collier, Chief Executive Officer, London City Airport, believes the decision goes against everything that the Mayor supports and promotes.

“It is ironic that the Mayor of London, whose platform has always been one of advantage for business in London, is denying the capital the business opportunity presented by growth at London City Airport.

It is doubly ironic that this decision was taken on LCY’s busiest-ever day , when more than 16,500 passengers passed through the terminal. Demand for the connectivity the airport provides is growing, driven by the success of London as a global business centre, and to service this demand, the airport needs to grow.

Development at London City Airport, which is in line with current aviation policy, would also inject extra airport capacity into the London system at a time when that capacity is very constrained – and will continue to be at least until 2030, which is the earliest date that new runway infrastructure could be delivered. The Mayor’s decision has also jeopardised this additional capacity uplift.”

London City Airport is considering the substance of the Mayor’s direction to refuse and will make a decision on its response strategy in due course.

26/03/2015

This post was published on 27 March 2015 16:40

André Orban

M. Sc. Engineering

Published by
André Orban

Recent Posts

Boeing announces FAA certification of 737 MAX 10

Boeing says the US Federal Aviation Administration has certified the 737-10, the largest member of…

20 October 2026

European Parliament backs stronger passenger rights enforcement and clearer flight refunds

The European Parliament has approved updated rules to strengthen passenger rights enforcement across transport modes,…

20 October 2026

Three passengers hospitalised after illness on Eurowings Rhodes–Düsseldorf flight

Three passengers were taken to hospital after several travellers became unwell on a Eurowings flight…

20 October 2026

LATAM flight cancelled after reported fire at Lima airport

A LATAM Airlines Perú flight to Piura was cancelled before take-off at Lima’s Jorge Chávez…

20 October 2026

Air Serbia adds Miami among six new routes for summer 2027

Air Serbia has opened bookings for six new routes from Belgrade for summer 2027, led…

20 October 2026

London Heathrow adds six winter routes and welcomes Xiamen Airlines and beOnd

London Heathrow Airport has announced six additions to its winter 2026/27 route programme, including Virgin…

20 October 2026