The ILS had been renewed during works in 2017 and is operational in Category I since November 2017. This enables operations when visibility is reduced to 550 metres.
The system has now been certified by Belgocontrol for Category III, in accordance with ICAO (International Civil Aviation Organization) regulations. As from today, the ILS will be put into service in Category III. Consequently, runway 22L can be used when visibility is even more reduced, that is to say up to 125 metres.
Common project of Belgocontrol and SOWAER
The ILS of runway 04R (in the opposite direction) had already been renewed and certified for Category III in 2016. In this way, Liège Airport’s main runway is now always open in reduced visibility conditions.
The renewal and certification of both runways is a joint project between Belgocontrol and SOWAER (Société wallonne des aéroports). The total cost is nearly four million euro.
This post was published on 5 February 2018 13:57
Embraer has delivered the first E175 equipped with RECARO R2 passenger seats to American Airlines,…
LOT Polish Airlines has joined TSA PreCheck, allowing eligible passengers departing from participating US airports…
Munich Airport will offer 182 destinations in 67 countries during its winter 2026/27 timetable, with…
A Canadair Challenger 604 operated by Triton Aviation made an emergency landing at Abuja’s Nnamdi…
Antwerp Airport could see electric passenger aircraft enter service from 2030, with ASL Group and…
VINCI Airports handled 93.5 million passengers in the third quarter of 2026, down 0.6% year-on-year,…