Centralny Port Komunikacyjny Airport (CPK)

CPK: Revolutionising transport connectivity in Central and Eastern Europe

Share

Centralny Port Komunikacyjny (CPK), the new airport to be build in Poland, is a comprehensive multimodal transport project based on three main pillars: an airport hub, a new rail network, and an airport city. As a strategic infrastructure investment, CPK will integrate air, rail, and road transport, connecting nearly 180 million inhabitants of Central and Eastern Europe (CEE).

The CPK railway investment includes the construction of approximately 2,000 km of new high-speed railway lines and several horizontal projects. They will create seamless, fast, and interoperable travel between major cities in Poland and improve the connectivity in the CEE region, making it more competitive against short-haul flights. CPK will also provide a significant boost to freight traffic capacities in the region, playing a crucial role in improving connectivity and enhancing economic growth in the CEE region.

“CPK is not just a strategic infrastructure project for Poland, but also a major integrator of the CEE region. We believe that the CPK project, with its multimodality, will significantly boost connectivity in the CEE region, especially along the North-South axis. Together with regional initiatives like Rail Baltica, the Czech HSR Program, and the V-4 High-Speed Rail project, CPK will deliver a new, dense, and interoperable transportation network across the region” – said Mikolaj Wild, CEO of Centralny Port Komunikacyjny. “It means that CPK is not alone in the efforts. By cooperating at all levels with these sister projects CPK is already taking shape as a cross-border initiative that will bring the CEE region closer together,” he added.

Integrated railway network for both passenger and freight transport

The new CPK railway lines have been designed to accommodate both passenger and freight traffic. The passenger traffic will be served by high-speed trains while the freight trains will transport freight, for which speed and reliability are critical factors. To ensure efficient and reliable freight transport, CPK is prioritising intermodal trains, particularly shuttle trains that operate on a fixed timetable at guaranteed time slots. This approach will provide greater flexibility for freight operators, while also ensuring that passenger services run on time and at high speed. The integration of both passenger and freight services will lead to a more sustainable and cost-effective transport system in the CEE region.

“We believe that planning locations of intermodal terminals along CPK railway infrastructure is crucial for further developing intermodal markets and achieving climate goals. These terminals will be designed to serve 750 m long trains and provide excellent connections to both rail and road networks, ensuring seamless and efficient transport of intermodal units – containers and semi-trailers. The CPK terminals should operate as an integrated network. Private terminal operators will be required to ensure consistent and high-quality service,” says Mikolaj Wild.

Upon completion, the CPK’s fast, frequent, and seamless railway infrastructure will comprehensively address numerous mobility needs in the region. It will deliver a direct connection to the CPK Airport from every major city in Poland via a high-speed rail network, linking the country’s largest cities with a travel time of under 2,5 hours. Finally, CPK will serve as a gateway to Eastern Europe, offering international routes covering the whole of Central and Eastern Europe and connecting Polish railways with neighbouring countries.

This post was published on 4 May 2023 09:00

Bart Noëth

Working for 25 years in the aviation industry, I changed my career and became a firefighter/EMT in 2021. I like to spend my free time with my two sons, girlfriend, family and friends. I love to travel, wine and dine and support my favourite football squad KV Mechelen. Once an Ironman 70.3 finisher and dreaming of completing a full distance.

Published by
Bart Noëth

Recent Posts

Typhoon Champi forces cancellation of more than 600 flights in Taiwan

Typhoon Champi has disrupted air travel across Taiwan, forcing the cancellation of more than 600…

23 October 2026

Copenhagen Airport faces major security queues after new screening requirements

Copenhagen Airport (CPH) is experiencing major queues at security screening after new requirements introduced by…

23 October 2026

Istanbul Aviation Forum to bring industry leaders together in April 2027

The Istanbul Aviation Forum will return to Türkiye on 27–28 April 2027, bringing together airline…

23 October 2026

A new gateway to the Gulf : Etihad Airways connects Luxembourg and Abu Dhabi

Luxembourg, October 21st 2026, Etihad Airways (*) opens a New Chapter in Luxembourg. Etihad Airways…

23 October 2026

American Airlines 787 suffers tyre failure after landing at Chicago O’Hare

An American Airlines Boeing 787-8 registered N806AA arriving from Barcelona suffered a tyre failure after…

21 October 2026

Norwegian adds four routes from Oslo, Copenhagen and Billund for 2027

Norwegian will launch four European routes in 2027, connecting Oslo and Copenhagen with Seville, Copenhagen…

21 October 2026