Amsterdam Airport Schiphol will temporarily take its runway 18R/36L (aka Polderbaan) out of weekday operations from May 4 to May 12 as part of scheduled annual maintenance, prompting a redistribution of air traffic across other runways.
During the maintenance period, aircraft movements will primarily be redirected to the runways 18C/36C (Zwanenburgbaan) and 09/27 (Buitenveldertbaan), with 04/22 (Oostbaan) also used depending on wind conditions. Night operations will rely mainly on 18C/36C. The 18R/36L will remain available over the weekend.
The works are part of routine safety upkeep and include asphalt and marking repairs, inspection of electrical systems and cabling, drainage maintenance, grass cutting, and the cleaning or replacement of runway lighting. The project is being carried out in partnership with construction firm Heijmans.
In parallel, Schiphol is undertaking the renewal of Taxiways A and B—key routes for aircraft taxiing to and from runways. By aligning both projects within the same timeframe, the airport aims to minimise overall disruption for passengers and surrounding communities.
However, the temporary shift in runway usage is expected to alter flight paths, potentially increasing noise over areas typically less affected. Schiphol acknowledged the impact on local residents, stating that maintenance scheduling is carefully planned to ensure efficiency and limit inconvenience.
Residents seeking updates or wishing to raise concerns can contact the Local Community Contact Centre Schiphol (BAS), which provides real-time information on runway use and air traffic patterns during the works.