“The excitement is building as we get ready to fly the first CS300 aircraft! Over the next few weeks, theCS300 aircraft will be outfitted with the latest software rolls, taking it to the most current production standards – therefore making it the most optimized and productive first flight of any test vehicle seen to date,” said Rob Dewar, Vice President, CSeries Program. “We elected to target early 2015 for the CS300 aircraft’s first flight to take advantage of the knowledge we acquired from the accumulation of data from the four flight test vehicles currently flying, thus allowing us to build maturity and reliability upfront.”
The CS300 aircraft’s entry-into-service (EIS) is expected to occur approximately six months after the CS100aircraft’s EIS, currently slated for second half of 2015.
This post was published on 4 December 2014 19:23
Air Tahiti has taken delivery of an ATR 72-600 fitted with a HighLine All-Business Class…
Liège Airport handled more than one million tonnes of cargo in the first nine months…
Air Canada will launch seasonal non-stop flights between Montréal and Seville on 8 September 2027,…
LOT Polish Airlines and Thai Airways have signed a Memorandum of Understanding to establish codeshare…
Portugal’s government has selected Lufthansa Group as the preferred buyer in TAP Air Portugal’s partial…
Brussels Airport welcomed 2,361,512 passengers in September 2026, an increase of 3.9% compared with the…